Ship repair
and modernization works
Recent projects 2008/2009 2008/2009

Fishing trawler MV “Maksim Starostin”

Installation of steam boiler 6 t/h and 2 fish meal plants 50 T/24h each, including all pressure pipelines and vent ducts.

Fishing trawler MV “Soley”

Reconstruction of cargo hold No.2, from canning to freezing hold total cap. 1200m3 with refrigeration temperature -28° G.